Walk It ATL

Planner dashboard · resident view ↗

Overall priority · —
— /100
green = strong → red = needs work. Same scale on every measure.
Click any street for all its scores & whether a sidewalk exists.

Drafted from this NPU's weakest measures and resident reports. Tune with your team.
Planning-level cost estimates — GDOT Appendix D, FHWA, TCRP, Arbor Day & municipal guides. Ranges shown as midpoints.
InterventionQtyCost
Package total$0

Pre-filled from this NPU's priority fixes — add or remove items from the menu. Next: projected score lift + report export.